Kwasi Kwarteng has revealed that he is “very sympathetic” to giving wave and tidal energy its own “baby pot” within the Contracts for Difference auction process. However, the energy minister acknowledged that there is an issue, particularly within the Treasury, about the higher upfront costs of supporting marine technology.