Across all the recent coverage on Hinkley Point C (HPC) there has been no dispute about the need to replace 21.4GW of generation capacity which has gone offline (or about to) since 2010 with secure and reliable power.
Across all the recent coverage on Hinkley Point C (HPC) there has been no dispute about the need to replace 21.4GW of generation capacity which has gone offline (or about to) since 2010 with secure and reliable power.