Cable defect monitoring: How AI is making networks healthier

Breakdowns in insulation and faulty cable joints or connections are problems for electricity networks.

A tiny partial discharge can be the initial sign of a deterioration in insulation that will worsen over time, meaning an asset fails or employees are endangered.

By proactively addressing partial discharge, the risk of equipment failure and associated hazards can be reduced. And the technology for checking partial discharge, for determining the health or otherwise of an electricity network, is also evolving with AI.

Read our Utility Week Intelligence Explains report with Ampacimon to find out how feeding a machine-learning based system with more than a decade’s worth of engineering expertise is enabling networks to detect partial discharge remotely and take the engineer out of the loop.

Sign up now (above right) to read the report to find out:

Waiting for failure of cable can cost millions each year.

Stay ahead of the game with Utility Week and learn how to implement remote monitoring for partial discharge today.

Want to learn more? Download the report now, above right.