Energy networks
Latest

Plan to extend Drax biomass subsidy sparks backlash
Politicians, environmental groups and climate campaigners have slammed the government for considering an extension to biomass subsidies at Drax Power Station. A government consultation moots a bridging support mechanism for large-scale biomass generators, including Drax Power Station, as they transition from the end of their current renewable schemes in 2027 to bioenergy with carbon capture and storage (BECCS). However, the consultation announcement faced a stiff backlash just hours after it was launched.
1 year ago

Data centres could be hot properties
1 year ago

DNOs ‘big blocker’ on local energy plans
1 year ago

Asset management in the decarbonisation era
1 year ago

Energy flexibility: The digital building blocks
Date: 25/01/2024 11:00 am
Load More