National Grid Electricity System Operator (ESO) has stood down the two backup coal units it had instructed to warm up in anticipation of tight supply margins, saying there would be “adequate available contingency” for Monday evening (12 December). Margins were expected to be tight due the recent cold spell combined with low wind output, which at the time of publication had remained below 2GW throughout Monday.