Summit Power said its Caledonia Clean Energy Project could be built as soon as the early 2020s with a strike price of just £80 to £90/MWh (2012) over a 20-year contract.
Summit Power said its Caledonia Clean Energy Project could be built as soon as the early 2020s with a strike price of just £80 to £90/MWh (2012) over a 20-year contract.