Ofgem has handed National Grid an extra £12.39 million to fund black start contracts, weeks after the system operator signed two contracts for Fiddler’s Ferry and Drax power stations.
Ofgem has handed National Grid an extra £12.39 million to fund black start contracts, weeks after the system operator signed two contracts for Fiddler’s Ferry and Drax power stations.