Northern Gas Networks (NGN) has begun testing how existing networks cope under 100 per cent hydrogen as part of the H21 project. MicroGrid is a gas distribution test grid which NGN claims is the first of its kind. It has been purpose-built by DNV and located at the latter’s test and research facility at Spadeadam, Cumbria.