Ofgem has confirmed the delivery models for shared offshore transmission infrastructure needed to achieve the government’s target of deploying 50GW of offshore wind by 2030. The regulator said these assets will either be built by generators themselves before an offshore transmission owner (OFTO) is appointed to operate them, or an OFTO will be appointed to both build and operate the assets.