Ofgem extends blackout protection for critical sites

Ofgem has approved a modification to the Grid Code that will further protect critical sites from being disconnected during emergency load shedding. The decision will allow distribution network operators to exclude protected sites such utilities, hospitals and railways from the second tranche of demand they disconnect when instructed to do so by the Electricity System Operator.

This content is for members only. Please click here to view the full article.