A record 4.6GW of capacity was tendered on local flexibility markets for delivery over the last year, the Energy Networks Association (ENA) has revealed. The latest figures also show that a record 1.9GW was actually contracted for 2022/23, with more than 70% of this made up of energy from low-carbon technologies.