Scottish Hydro Electric Transmission (SHET) has hit back at Ofgem’s proposal to introduce an availability incentive to ensure transmission operators (TO) rectify faults on subsea cables to islands as quickly as possible.
Scottish Hydro Electric Transmission (SHET) has hit back at Ofgem’s proposal to introduce an availability incentive to ensure transmission operators (TO) rectify faults on subsea cables to islands as quickly as possible.