A collaborative project between groups in the UK and France will see tidal stream turbines installed across the Channel, could "herald a point of maturity for the sector". Work is expected to be completed by 2023 at the five turbine sites with the option to increase capacity to 8MW and the ultimate potential for several GW across the Channel.