UU innovates to remove 200-tonne fatberg

A United Utilities engineer designed an innovative way to break up a 200-tonne fatberg from the inside out. His team shifted the mass of congealed fats and non-flushable items from a Liverpool sewer faster and at a lower cost than expected.

This content is for members only. Please click here to view the full article.