A United Utilities engineer designed an innovative way to break up a 200-tonne fatberg from the inside out. His team shifted the mass of congealed fats and non-flushable items from a Liverpool sewer faster and at a lower cost than expected.
A United Utilities engineer designed an innovative way to break up a 200-tonne fatberg from the inside out. His team shifted the mass of congealed fats and non-flushable items from a Liverpool sewer faster and at a lower cost than expected.